Case Studies > Motors & Repairs

pdf download

Associated British Ports
Immingham Dock
Impounding Pumps


The motors under consideration drive fi xed speed pumps which fill the lock at the dock entry to maintain a water level. The motors were installed many years ago and during the study to evaluate the fi tment of VSD’s one of the pump motors suffered a catastrophic failure thereby accelerating the need to find a speedy solution.

Southern & Redfern Industrial Solutions developed a replacement solution which was accepted and ordered by ABP – the scope being to remove all old 3.3kV switchgear and supply and install a new 690V motorrated at 630kW coupled to a 12-pulse 1MW VSD fed from an 11,000/690V transformer.

The new motors weigh almost 10 Tonnes – Southern & Redfern Industrial Solutions also developed the necessary mechanical interface between the new motor and existing pump.


© Southern & Redfern Group Ltd - All content on this website is owned by Southern & Redfern Building Services/Industrial Solutions Limited.
Use of this content without prior written permission is strictly prohibited and will result in prosecution.