Southern & Redfern undertook the contract for
the fit-out of the ground and first floors at Bridgewater
Place, Leeds over a 12 week period. This involved stripping out/relocation
and re-installation of the existing heating and chilled water
pipework, domestic water, ventilation, fan coil units, lighting,
small power, data, security and access control.
Mechanical and Electrical services
provided are:-
• Provision of new and relocation of 4 pipe fan coil units
to suit the
required layout from the Cat A shell.
•
Provision of new ventilation to each floor from the existing
ventilation riser
ducts and modifications to existing.
•
Domestic services and drainage extension to the new toilet and kitchen areas.
•
BMS and lighting controls modifications to suit new layout and client requirements.
•
New lighting and specialist/feature lighting, small power, fire alarms,
floor
void bus bar, and sub mains distributions to each individual floor.
•
New data, access control and security installation to suit the clients
bespoke
requirements.
|